For Sustainability

The fastest path to reducing Scope 1 and 2.

Noda works autonomously to find GHG and OpEx savings across your portfolio, with verified reductions ready for disclosure.

GHG Emissions ReducedTrailing 12 Months1,901,591 kgCO₂e
15–25%
Typical annual energy savings reported by customers
335K
kWh cut in a year at one oceanfront resort by taking a pump out of sequence
300M
Sq ft under Noda analysis, across leading global portfolios

Put AI to work on your carbon footprint.

Noda's AI agents analyze every connected building around the clock, finding waste and savings at every site.

Verified reductions by building

Noda's AI agents build each Project with the savings estimated, and validate the reduction against a pre-implementation baseline once work is done.

Energy Consumption by Building
This YearPrevious Year
0 kWh700,000kWh1,400,000kWh2,100,000kWh2,800,000kWh4400 LexingtonTowerOne NorthstarPlaceRiversideExchange1850 SequoiaCenterThe CromwellBuilding

Building intelligence on call

Ask the Noda Assistant about your buildings and get a reasoned, contextual response, without waiting on busy site teams.

Noda Assistant One Northstar Place
Why did gas use rise at One Northstar Place last month?

Boiler B-1 fired overnight on 9 of the last 14 nights while the building was unoccupied.

Open B-1 runtime chart

Its schedule is still on a temporary override that was never released. This is already a Project, worth $6,240/yr.

Open Restore B-1 schedule
Ask a question…

AI that supercharges savings

Noda's AI agents find, validate, and scope operational Projects with clear action steps, so it's faster and easier for building engineers to execute energy-saving work.

Identified by AI
Economizer damper fault
The Cromwell Building · AHU-4
DiagnosisOutside air damper stuck at minimum position
Needs Acceptance$11,200/yr
  • Johnson Controls
  • Honeywell
  • Siemens
  • Trane
  • Schneider Electric
  • Automated Logic
  • Distech Controls
  • Delta Controls
  • Tridium
  • Alerton

Works with the systems you already use.

Noda collects BMS data at each site through the Noda LaunchPad, a secure on‑premises gateway, which also connects to controllers and sensors that use BACnet/IP, Modbus or MQTT. Meter data arrives through a separate Noda gateway. Sites keep the building systems and meters already installed.

Cut emissions without CapEx

Class A officeChiller plantOpEx reduction

$166,000 in annual savings by rerouting tenant loads off a 24/7 chiller plant.

What Noda Diagnosed

A landmark DC office tower ran two chillers 24/7 to serve tenant supplemental loads, even though overnight activity was minimal. Migrating those tenant systems to the retail condenser loop let the main chiller shut down 9 PM–6 AM, cutting ~20,000 kWh weekly year-round.

~20K kWh reduced weekly
Chiller off 9 PM–6 AM
Sustained year-round
Zero comfort impact

Related reading

Frequently asked questions

  • How are emissions reductions calculated?

    Noda multiplies each Project's electricity and natural gas savings by the building's emissions factor and reports the result in kgCO2e. Emissions factors are set per building, and a Project can carry its own factor where a specific one applies.

  • Can these figures support ESG reporting?

    Noda reports energy saved and GHG emissions reduced for the portfolio and for each building, with a report on each completed Project covering its impact, diagnosis and actions. Teams can carry those figures into frameworks such as GRESB and CDP alongside utility data.

  • How does Noda help with building performance standards such as Local Law 97?

    Building performance standards such as Local Law 97 cap emissions or energy use per square foot of floor area. Operational Projects lower both in occupied buildings without construction, and Noda records the reduction from each Project.

  • Do we need new meters or sensors?

    Noda starts from the BMS trend data and meter data already available at each site, collected through Noda's on-site gateways.

  • Who carries out the Projects?

    Site engineers and operating teams review each Project Noda delivers, accept it, and complete its Tasks. Each Project arrives with its diagnosis, recommended actions and estimated savings attached.

Turn operational savings into reported reductions.

Noda continuously scans for energy waste across your portfolio and sends teams the fixes.

Get a demo